NJACI Dinner Meeting - September 26, 2024

 

September 26, 2024
5:30 PM - 8:30 PM
Add to Calendar

 

Pines Manor
2085 Lincoln Highway
Edison, NJ 08817
Venue website
Directions

Speakers

David Tuckman - Hardesty & Hanover,  
Brian Mileo - Hardesty & Hanover and 
Steve Zapoticzny  - Gannett Flemming 

About the Project

The Raritan River Bridge Replacement Project.  This large scale, $250+ million project used over 65,000 cubic yards of concrete. The numerous structures using concrete included drilled shafts up to 235 feet deep utilizing self-consolidating concrete , pier caps, abutments, duct bank, retaining walls, catenary pole foundations, and continuous flight augured piles. Two main span piers incorporated nearly 7500 yards of a special tri-blend mix designed for ease of placement and to reduce the heat of hydration. Thermal monitoring using embedded thermocouples was used to track the internal temperature of the mass concrete pours with the intent of mitigating cracking. 

Owner: New Jersey Transit
Engineer: Gannett Fleming &  Hardesty & Hanover
Construction Manager: AECOM & Mott McDonald
General & Concrete Contractor: George Harms Construction Co.
Ready-Mix Concrete Supplier: Ralph Clayton & Sons

Tickets

$85.00 Member Registration (includes 1.0 AIA LU/PDH Accredited)

$65.00 Sponsor a Student

$95.00 Non-Member Registration